A house isn't built in a day
Jerom Verschoote

A custom system does not have to arrive in one go. The building plan I work with divides the work into three phases, each of which goes into use on its own.
The first phase is a central platform where files, clients, planning and documents come together. The second phase connects that platform to the rest of your operation: integrations and automation bring data to the right place. The third phase is a customer-focused website that builds on that system.
That order is a deliberate choice. The platform goes into use first and runs while the next phase is being built. That period shows where the operation pinches, so the integrations that follow start from established bottlenecks. It also gives a team the room to adjust one change at a time, instead of switching to an entirely new working environment in a single day.
A different order is possible. When the website is the most urgent, it gets built first and connected to the systems you use today. In the long run that is less than ideal: once the platform arrives later, part of those connections has to be rebuilt. That is why the building plan preferably starts at the base.
Such a project runs smoothest as one continuous whole, though it can just as well happen in separate periods when that suits your business better. Every phase delivers a result that is usable on its own, and the invoicing simply follows the work: I invoice monthly, as it progresses.
We look at the software you use today in the first phase. A package that works well gets connected; a package that gets in the way can be replaced by the platform. Nothing has to disappear because the project starts.
The size of your request does not have to be a threshold. A large whole gets planned, delivered and invoiced in phases, at a pace that fits your business.